How to install thermal insulation wall panel?

Installing insulation wall panels in a factory building is a process that involves multiple steps and details. The following is a detailed installation process:

1. Preliminary preparation

Design planning:

Determine the specifications, models, and quantities of insulation wall panels based on the actual situation and design requirements of the factory building.

Develop a detailed construction plan, including installation sequence, material requirements, personnel allocation, etc.

Material preparation:

Purchase insulation wall panels that meet the requirements to ensure quality and accurate dimensions.

Prepare necessary installation tools and auxiliary materials, such as welding machines, cutting machines, nylon belts, specialized adhesives, etc.

On site preparation:

Clean up the debris in the installation area of the factory building to ensure a clean construction environment.

According to the construction plan, plan the material storage area, construction passage, and work area.

install thermal insulation wall panel

2. Construction steps

Measurement and laying out:

According to the design drawings, pop up installation control lines on the walls of the factory building, including vertical lines, horizontal lines, door and window opening position lines, etc.

Install connectors:

Install connectors on the frame columns or walls of the factory building, such as C-shaped grooves, stainless steel diagonal handle connectors, etc., to ensure accurate positioning and firm welding.

Wall panel hoisting:

Use a crane or electric hoist to lift the insulation wall panel to the installation position, paying attention to protecting the edges and corners of the wall panel to avoid damage.

During the lifting process, it is important to ensure that the wall panels rise smoothly and avoid collisions and shaking.

Fixed in place:

After placing the wall panel in the predetermined position, use connectors to fix the wall panel to the frame column or wall.

Adjust the horizontal and vertical alignment of the wall panels to ensure a smooth and secure installation.

Gap treatment:

The gaps between the wall panels can be filled and sealed using specialized adhesives or sealants.

Ensure that the gap treatment is smooth and aesthetically pleasing, without any missing filling or sealing.

Inspection and acceptance:

After installation, conduct a comprehensive inspection of the insulation wall panels, including installation quality, flatness, verticality, etc.

Promptly rectify problems and ensure that the installation quality of insulation wall panels meets the design requirements.

3. Precautions

Safe construction:

During the construction process, safety operating procedures should be strictly followed to ensure the personal safety of construction personnel.

Wear safety protective equipment such as helmets, seat belts, etc.

Quality Control:

Strictly control the quality of materials to ensure that the insulation wall panels meet the design requirements.

Strengthen quality control and inspection during the construction process to ensure that the installation quality meets the standards.

Environmental protection:

During the construction process, attention should be paid to environmental protection to avoid pollution such as noise and dust.

Reasonably arrange construction time and reduce the impact on the surrounding environment.

By following the above steps and precautions, the installation quality and effectiveness of the factory insulation wall panels can be ensured.

Your Important Partner In The Steel Structure Construction Industry
Cost effective solutions for your project
Free provision of 3D model drawings for steel structure design
Good quality, low price, safety, and easy installation

Copyright © 2024 Henan Canglong Steel Structure Engineering Co., Ltd. All Aights Reserved.